Construction & commissioning pipeline
Panels that have passed each stage. Red stages are where work is piling up.
Key insights
Calculated live from the tracker
Where each panel stands today
Each panel placed at the first stage it has not yet passed
Completion by area
Construction complete vs. T&C complete
Level-by-level progress
Panels passed at each stage. Shade shows the share of the level's panels.Level-by-level progress
Panels passed at each stageConstruction complete by BCC
Podium panels grouped by building control centre
Construction complete by ALEMCO PM
Area-wise project manager in charge
Construction progress by person
Panels under each person that are fully constructed
Where their panels stand
Status mix of each person's panels
People
Click a person to see their panels and blockersStage by stage
Approved (green), WIR raised but not approved (red) and in progress (yellow) at each construction stageWhere unbuilt panels are stuck
First construction stage each unfinished panel has not passed
Siemens installation & termination approval
Status recorded in the tracker for every panel
Construction blockers
Why unbuilt panels are held up, taken from the approval and containment notes
Unbuilt panels by level
Panels not yet construction-complete
Panels still in construction
Click a row for the full panel record
Constraint types
Click a type to filter the log below
Who needs to act
Worked out from the wording of each item
Equipment affected
Equipment named in the constraint text
Constraint log
The tracker's “Construction Remarks” column is empty, so these constraints are pulled from four places: notes typed into the stage cells instead of a WIR number, Podium containment notes, the Siemens installation & termination approval status, and WIRs raised but not approved (red cells). Only panels that are not yet construction-complete are included.
Constraint types
Click a type to filter the log below
Who needs to act
Based on the constraint type and wording
Stage being blocked
Where in the construction sequence each item sits
Constrained panels by level
Unbuilt panels with at least one constraint
Constrained panels by BCC
Unbuilt panels with at least one constraint
Construction constraint log
Containment is only tracked on the Podium sheet, so Tower panels are not included on this page.
Containment status
All 434 Podium panels
By level
Completed / total
By zone
Completed / total
By BCC
Completed / total
Containment targets
Panels with a target date that are not yet complete
Equipment energisation (ALEMCO)
Status recorded per panel
DDC testing status (Siemens)
Status recorded per panel
Construction complete, waiting on power
Finished by the BMS team but cannot be tested until ALEMCO energises them. Click a row for details.
ApprovedWIR raised, not approvedIn progressNot startedAC Area clearance · DI DDC install · CB Cabling · CC Continuity · DT DDC term. · FT Field term. · FD Field devices
| Panel ID | Area | Level | BCC | Stages | Current status | Power | T&C | Graphics |
|---|
Why this matters: the tracker counts a stage as done only when its cell is filled bright green, and nothing checks that colour against the WIR text. The items below make the summary figures slightly wrong. Fix them in the Excel file, then refresh the dashboard.
| Severity | Category | Panel ID | Area | Level | Excel row | What's wrong |
|---|